GAS-BOOSTER SYSTEM UP TO 1600 bar
2 August 2014
NEW TEST PACK IN TRENITALIA
15 September 2014

TEST WASIT PIPELINE IN SAIPEM

The system with high flow hydraulic air pumps, was designed for test the Pipeline Project Wasit.
Maximum pressure 450 bar with double pump. High capacity and ability to control up to 4 lines independently.

 

IMG_3238